Hi Kim

 

Here are the two last excel costing files - click to download:

 

BQ Diveschool 3 - with temple tile roof

 

BQ Diveschool 4 - with cost cuts

 

Best regards

B

 

 

Saturday, May 03, 2003

 

HI KIM

 

COST CUTTING ITEMS – DIVE SCHOOL

 

1. CHANGE ROOF TO GRASS (KEEP SAME DESIGN STYLE)

Maybe we change back to Temple Tiles in 2 or 3 years – I will get price from local people through Seng Chai for grass roof.

 

2. CHANGE FROM SANDSTONE TO FACE BRICK FOR OUTSIDE  WALLS

Maybe we change back to Sandstone in 2 or 3 years. Please tell me what price to use now for labor – we used first cost 210 for materials and 95 for labor.

 

3. REMOVE THIRD FLOOR SLAB AND REDUCE STRUCTURE COST

We take off third floor concrete slab, and if possible reduce cost for structure. Also change structure to foundations if possible for faster. >>> Remember we wanted to put 2 water tanks in the roof for water supply – not in first pricing!

 

4. CHEAPER DOWNLIGHTS – OK I can do

 

5. CHANGE FOOR TILES TO CEMENT IN AREAS

You told me to change to 50 Baht per square meter for cement topping include some green/black/red powder color.

 

I found some other small mistakes in the architect’s drawings:

 

 

Best regards to all -- when are you coming back?

Bill